Location: Philippines

 

Bridge Type: Single Lane

22.8m single lane Unibridge® built between Odicon and Tagbak in the Philippines.

Simple, standard design concrete abutments were constructed within 4 weeks after which the bridge components were delivered to site. Using a 35t crawler crane with 10 personnel the bridge was erected within 1 week.

Comments are closed.